" 30M+ Google Gemini tokens went into researching, analyzing, and understanding all 233 SIH problem statements to make them easier to explore and solve. "
From what to build to how to build it — our platform helps you understand, plan, and solve SIH 2026 problem statements with complete insights into requirements, solution approaches, technology stacks, architecture, AI/ML, and implementation roadmaps.
Search for your problem statement, and start building your solution.
| Description: | • Description • Facade-Driven Architectural Expression-Develop an innovative facade system that enhances architectural aesthetics, responds to climate (light, heat, ventilation), and blends with the surrounding urban context. • Breathable & Nature-Integrated Design-Incorporate a central landscape courtyard and green interfaces (terraces, balconies) to create an airy, breathable structure that integrates nature and improves occupant well-being. • Residential & Commercial Design Efficiency-Ensure functional planning for commercial activation on lower floors and well- designed residential units above, with optimal daylight, ventilation, privacy, and views. • Structural Modeling & Detailing-Create 2D structural drawings for key components such as beams, columns, and slabs, including necessary detailing.The model should include all essential building elements: beams, columns, slabs, stairs, and tile flooring. • Good to Have (Optional) - Site Compatibility & Environmental Analysis (Using Forma Site Design)-Utilize Forma Site Design to study site orientation, sun path, wind conditions,and massing strategies, ensuring the design is environmentally responsive and contextually appropriate. (1-2 Hour) • High-Quality Visual Presentation & Walkthrough-Deliver a pictorial, design-focused presentation including rendered views, facade studies, diagrams, and a 30-second walkthrough animation.Rendering quality and visual storytelling will be key evaluation criteria. • Participation Guidelines For Idea Submission: • Each student team should submit Revit 3D Model of a Basement Parking + Ground + First Floor that creates a vibrant urban destination while seamlessly integrating nature, sustainability, and user well-being and a PowerPoint presentation (5-7 Slides). • Models should be created using ONLY Revit and not copied or taken from any other source. • AI Generated content is NOT ALLOWED. For Grand Finale: Students must use Autodesk Revit to design and create 3D Model of specific mixed used building within the given time period and present the following to the jury members: Design a B+G+9 mixed-use development that brings together active commercial spaces and sustainable residential living. Create a nature-integrated, climate-responsive building centered around a landscaped courtyard that enhances daylight,ventilation, and occupant well-being. Key Deliverables: • Commercial podium (Basement Parking + Ground + First Floor) with retail, cafés,and community spaces. • Residential levels (2nd–9th Floor) featuring efficient layouts, balconies, natural ventilation, and privacy. • Innovative climate-responsive facade with shading elements and green terraces. • Central landscaped courtyard as the project's defining feature. • Complete Autodesk Revit model with architectural and structural elements,including detailed drawings. • Optional Autodesk Forma studies for sun, wind, and environmental analysis. • High-quality presentation with renders, diagrams, facade studies, and a 30-second walkthrough animation. • PPT explaining the final project. • Complete Structural reinforcement drawing of any one floor along with detailing. • Complete 3D Model. • Rendered images and Walkthrough video (30 secs.) of the final Model. Note: Teams coming with pre-designed files will be disqualified. • Attach Marking Criteria Table here* • Faculty (SIH SPOC) Form Teams choosing to submit idea for Autodesk’s problem statement are required to request their faculty (SIH SPOC) to fill this 'Mandatory Form'. • Autodesk Revit • Autodesk Revit is a Building Information Modeling (BIM) software primarily used by architects, engineers, and construction professionals to design, model, and document buildings and infrastructure in 3D. • Students and educators can click Here to get FREE access to Revit. |
| Organization: | Autodesk |
| Department: | Autodesk Education Experience |
| Category: | Software |
| Theme: | Miscellaneoustd> |
| Youtube Link: | Not provided |
| Dataset Link: | Additional Information regarding PS https://drive.google.com/drive/folders/1KYkkQjRbpq--YRF5sgVndjLGgItqLr1b |
| Contact info: | Not provided |
The Urban Mixed-Use Design Challenge (SIH26116) mandates the architectural design, environmental optimization, structural modeling, and detailed engineering documentation of a centrally located urban mixed-use development comprising 1 Level of Basement (Car Parking + EV Charging), 2 Commercial floors (Ground + 1st Floor), and 8 Residential floors (2nd to 9th Floor), achieving a total structure of B+G+9 [PS]. Sponsoring authority Autodesk Education Experience requires that the entire 3D Building Information Model (BIM) be authored natively using Autodesk Revit without external pre-made assets or AI-generated models/renders [PS]. The project addresses urban density and thermal stress through a central landscaped courtyard (courtyard effect), climate-responsive parametric facade systems, green terraces, and full compliance with Indian structural and safety standards (NBC 2016 / NBCS 2026, IS 456:2000, IS 1893:2016) [KNOWN]. Key outputs include a fully integrated Revit BIM model, 2D structural framing drawings, full 3D rebar detailing for a representative residential floor, optional environmental microclimate analysis via Autodesk Forma Site Design [PS], a 5–7 slide presentation deck, and a 30-second rendered architectural walkthrough animation [PS].
| Field | Value |
|---|---|
| Problem Statement Number | SIH26116 [PS] |
| Title | Urban Mixed-Use Design Challenge - Design a centrally located mixed-use building in Autodesk Revit with commercial spaces (Ground + 1st floor) and residential units (up to 8 floors). 1 Level of Basement (Car Parking + EV Charging), Total (B+G+9) [PS] |
| Organization | Autodesk [PS] |
| Department | Autodesk Education Experience [PS] |
| Category | Software [PS] |
| Theme | Miscellaneous [PS] |
| Submission Deadline | 30 September 2026 [PS] |
| Ideas Counter | 0/500 [PS] |
| Official Dataset/Folder Link | https://drive.google.com/drive/folders/1KYkkQjRbpq--YRF5sgVndjLGgItqLr1b [PS] |
To engineer a climate-responsive, structural-grade, B+G+9 mixed-use BIM prototype in Autodesk Revit featuring active commercial podiums, sustainable residential units, a microclimate-regulating central courtyard, complete 3D rebar detailing, and Autodesk Forma environmental validation without pre-built or AI-generated assets [PS].
Requirement 1 (Building Typology & Massing Structure) [PS]
mm) units in Revit.Requirement 2 (Facade-Driven Architectural Expression) [PS]
Requirement 3 (Breathable & Nature-Integrated Design) [PS]
Requirement 4 (Commercial Podium & Residential Functional Efficiency) [PS]
Requirement 5 (Structural Modeling & Detailed 2D/3D Engineering) [PS]
Requirement 6 (Basement Car Parking & EV Charging Infrastructure) [PS]
Requirement 7 (Site Compatibility & Environmental Analysis via Autodesk Forma) [PS]
Requirement 8 (Presentation, Renderings & 30-Second Walkthrough Video) [PS]
Requirement 9 (Compliance, Authoring Constraints & Anti-Disqualification Rules) [PS]
| Stakeholder Group | Primary Goal | Current Pain Point / Challenge | System / BIM Design Need |
|---|---|---|---|
| Commercial Retailers & Visitors | High footfall, accessible retail shops, pleasant dining, easy parking, and EV charging. | Dark, congested commercial podiums with poor access, lack of parking, and unpleasant microclimate. | Open-plan Ground + 1st floor retail layouts with double-height atriums, direct courtyard connections, accessible ramps, and basement EV parking [INFERENCE]. |
| Residential Occupants | Comfortable, well-lit, naturally ventilated, quiet homes with balcony greens and absolute privacy from commercial zones. | Noise transfer from commercial lower floors, poor daylighting, lack of cross ventilation, elevated air conditioning bills. | Acoustically isolated slab transitions on 2nd floor, central courtyard air-shaft for cross-ventilation, shaded balconies, and private residential entry cores [INFERENCE]. |
| Structural Engineers | Buildably compliant concrete framing capable of taking gravity, wind, and seismic loads without rebar congestion. | Lack of precise rebar clash detection, unverified beam-column joint details, non-compliance with IS codes. | Integrated Revit structural BIM with parametric rebar placement (IS 456 / IS 13920), 2D framing layouts, and Bar Bending Schedules (BBS) [RESEARCHED]. |
| Facility & EV Operations Manager | Efficient maintenance, smooth basement traffic flow, fire safety compliance, and EV load management. | Grid overload from EV charging, dark basements, dead-end parking aisles, difficult utility maintenance. | Well-ventilated basement layout with 7.5m column grids, dedicated MEP/EV distribution corridors, and dual evacuation staircases [INFERENCE]. |
| Municipal / Approval Authorities | Verification of Floor Area Ratio (FAR), setbacks, NBC fire evacuation safety, and parking norms. | Ambiguous 2D plans with unverified area calculations and non-compliant stair/corridor widths. | Accurate Revit schedule-driven FAR/FSI calculations, automated area plans, and NBC-compliant fire exit widths (minimum 1.5m corridors, 1.25m-1.5m stairs) [RESEARCHED]. |
| SIH Jury / Autodesk Evaluators | Comprehensive proof of Revit BIM mastery, structural detailing, environmental responsiveness, and visual presentation. | Standard, uninspired rectangular box designs with zero structural depth or missing walkthroughs. | Parametric climate facade, central courtyard stack effect, complete 3D rebar detailing on 2nd floor, Forma microclimate analysis, and crisp 30-sec video [PS]. |
| Proposed Feature / Design Element | Exact Requirement Source | Technical Justification & Implementation |
|---|---|---|
| B+G+9 Level Spatial Hierarchy | Requirement 1 [PS] | Modeled directly in Revit with exact height parameters: Level -1 (-3.5m), Level 0 (0.0m), Level 1 (+4.2m), Levels 2–9 (+3.1m pitch). |
| Basement Parking + 15% EV Infrastructure | Requirement 1 & 6 [PS] | 7.5m x 7.5m structural grid accommodating 3 car spaces per bay, vehicle ramps (1:8 pitch), and dedicated EV charger pedestal families following MoHUA / NBC 2016 EV norms [RESEARCHED]. |
| Climate-Responsive Parametric Shading Facade | Requirement 2 [PS] | Custom Revit Adaptive Curtain Panel family controlled via angle parameters to reduce solar radiation on West/South facades. |
| Central Landscaped Courtyard & Green Terraces | Requirement 3 [PS] | Massing designed around a central atrium to induce thermal chimney stack effect, paired with cantilevered balcony planter boxes. |
| Commercial Podium (G+1) & Residential Units (2-9) | Requirement 4 [PS] | Ground/1st Floor commercial retail/cafes with double glazing; 2nd–9th Floors featuring 2BHK/3BHK residential layouts with dual-aspect cross ventilation. |
| 2D Framing Drawings & 3D Rebar Detailing | Requirement 5 [PS] | 2D structural sheets for beams/columns/slabs plus complete 3D rebar modeling (IS 456 / IS 13920) for 2nd Floor junction nodes with automated BBS schedules in Revit. |
| Autodesk Forma Sun & Wind Microclimate Analysis | Requirement 7 [PS] | Cloud-based simulation in Autodesk Forma Site Design evaluating annual sun hours, wind velocity contours, and outdoor thermal comfort. |
| 5–7 Slide PPT & 30-Second Walkthrough Video | Requirement 8 [PS] | High-definition MP4 walkthrough animation rendered via Enscape/Twinmotion/Revit Camera Walkthrough and concise slide deck. |
| 100% Native Revit Authored Model (No AI/Pre-made) | Requirement 9 [PS] | Fully parametric model created from scratch in Revit without importing pre-existing 3D models or AI-generated texture/render artifacts. |
| Data Type | Purpose | Ideal Real-World Source | Hackathon Substitute | Access Method | Availability | Privacy Sensitivity | Confidence Tag |
|---|---|---|---|---|---|---|---|
| Site Topography & Context GIS | Contextual massing & road alignment for Forma analysis. | OpenStreetMap (OSM) / Bhuvan ISRO / Municipal GIS. | Autodesk Forma native context import / OpenStreetMap vector download. | Direct web fetch in Forma. | Public / Available | None | [RESEARCHED] |
| Solar & Microclimate Data (EPW) | Sun path, solar radiation, and wind rose data for environmental simulation. | ISHRAE / EnergyPlus Weather (.EPW) database for target city (e.g. Bengaluru / New Delhi). | Standard EnergyPlus EPW weather file loaded into Autodesk Forma / Revit Insight. | Direct download from EnergyPlus.net. | Public / Free | None | [RESEARCHED] |
| Building Code Regulations | Setbacks, FAR, height restrictions, fire exit widths, parking norms. | NBC 2016 / NBCS 2026 (SP 7:2026), MoHUA Model Building Bye-Laws. | Bureau of Indian Standards (BIS) documentation & municipal bye-law summaries. | PDF reference / BIS portal. | Public | None | [KNOWN] |
| Structural Rebar & Material Specs | Fe500D / Fe550 rebar properties, M30/M40 concrete grade structural framing parameters. | IS 456:2000, IS 13920:2016, IS 1893:2016 structural codes. | Embedded Revit Structural Material Library & custom family parameters. | Built-in Revit templates. | Available | None | [KNOWN] |
| EV Charging & Electrical Load Specs | AC Type 2 / DC Fast Charger dimensions, cable tray layout, and transformer capacity sizing. | MoHUA Guidelines for EV Infrastructure 2019 / Central Electricity Authority (CEA). | Standard 3D Revit family components for EV Charger pedestals and distribution boards. | Autodesk Content Library / Custom Revit Family creation. | Public | None | [RESEARCHED] |
mm assumed by students; total B+G+9 configuration; commercial Ground+1st, residential 2nd–9th; 1 basement level [PS].+-----------------------------------------------------------------------------------+
| EXISTING VS PROPOSED GAP ANALYSIS |
+-----------------------------------------------------------------------------------+
| 1. Conventional High-Rise Block |
| [Solid glass cube] --> High HVAC Load | Dark Inner Core | No Rebar BIM Details |
+-----------------------------------------------------------------------------------+
| 2. Standard Disjointed CAD / 3D Modeling |
| [2D Plans + SketchUp render] --> Uncoordinated MEP/Structure | No Forma Data |
+-----------------------------------------------------------------------------------+
| 3. OUR PROPOSED REVIT + FORMA INTEGRATED SYSTEM |
| [B+G+9 Parametric Courtyard Building] |
| => Microclimate Optimization (Forma) + Passive Thermal Chimney Stack |
| => Full Structural Rebar Detailing (2nd Floor IS 456) + EV Basement Grid |
+-----------------------------------------------------------------------------------+
| Evaluation Criteria | Approach 1: Monolithic Compact Block with Glass Curtain Wall | Approach 2: Courtyard-Centered Climate-Responsive Parametric BIM (Recommended) | Approach 3: Stepped Terraced Modular Box Grid |
|---|---|---|---|
| Mechanism | Central vertical core with surrounding rooms; flush glass/masonry facade. | Central landscaped courtyard driving stack-effect ventilation; parametric sun-shading louver facade; green balconies. | Interlocking stepped residential blocks creating large open sky terraces at each floor level. |
| Problem Fit | Low (Fails biophilic courtyard & climate responsiveness criteria) [PS]. | High (Directly fulfills all PS requirements for courtyard, climate facade, and mixed-use layout) [PS]. | Moderate (Good terrace greens, but lacks compact central courtyard focus) [INFERENCE]. |
| Accuracy Potential | Standard architectural geometry [KNOWN]. | High spatial accuracy in Revit with parametric constraints [KNOWN]. | Moderate (Complex structural cantilever transfer beams required) [INFERENCE]. |
| Data Requirements | Basic floor dimensions [KNOWN]. | Site EPW weather data, solar angles, structural rebar parameters [RESEARCHED]. | Complex structural load distribution matrices [INFERENCE]. |
| Design Complexity | Low [KNOWN]. | Moderate to High (Balanced for hackathon execution) [INFERENCE]. | Extremely High (Complex floor-by-floor structural alignment) [INFERENCE]. |
| Explainability & Storytelling | Poor (Generic commercial tower look) [KNOWN]. | Exceptional (Clear microclimate performance story: sun, wind, stack effect) [RESEARCHED]. | Good (Visually dramatic stepped terraces) [KNOWN]. |
| Cost / Construction Feasibility | Standard [KNOWN]. | Highly efficient RCC frame with optimized material scheduling [INFERENCE]. | High structural cost due to deep transfer girders for offset columns [INFERENCE]. |
| Scalability | High [KNOWN]. | High (Modular residential unit planning) [INFERENCE]. | Moderate [INFERENCE]. |
| Hackathon Feasibility | Very High (Simple box to model) [KNOWN]. | Ideal (Fully achievable within student team build timeline) [INFERENCE]. | Risk of incomplete model due to complex structural transfers [INFERENCE]. |
| Production Feasibility | High [KNOWN]. | Excellent (Fully aligned with IS codes and NBC 2016) [RESEARCHED]. | Moderate [INFERENCE]. |
+-----------------------------------------------------------------------------------+
| AUTODESK REVIT BIM SYSTEM ARCHITECTURE |
+-----------------------------------------------------------------------------------+
| 1. CONCEPTUAL & ENVIRONMENTAL ANALYSIS LAYER (Autodesk Forma Site Design) |
| - OpenStreetMap Context Import | EnergyPlus EPW Weather Import |
| - Sun Hours Analysis | Wind CFD Pedestrian Comfort | Microclimate Heat Island |
| - Massing Export via Forma-to-Revit Direct Connector |
+-----------------------------------------------------------------------------------+
| (Sync via ACC / Local Link)
v
| 2. CORE ARCHITECTURAL & SPATIAL MODELING LAYER (Autodesk Revit 2024/2025) |
| - Level -1: Basement Parking (7.5x7.5m grid, Ramps 1:8, EV Pedestal Bays) |
| - Ground + 1st Floor: Commercial Podium (Atrium, Retail, Cafes, Glazed Facade) |
| - 2nd - 9th Floor: Residential Units (2BHK/3BHK layout, Balconies, Planters) |
| - Central Courtyard Void & Circulation Cores (Egress Stairs, Fire Lifts) |
+-----------------------------------------------------------------------------------+
|
v
| 3. PARAMETRIC FACADE & AUTOMATION LAYER (Dynamo for Revit) |
| - Parametric Shading Panel Families (Solar angle adaptive louver angles) |
| - Automated Rebar Distribution Scripts for Beam-Column Node Reinforcement |
| - Automated Room Schedule & Area/FAR Calculation Scripts |
+-----------------------------------------------------------------------------------+
|
v
| 4. STRUCTURAL ENGINEERING & DETAILING LAYER (Revit Structural Framing) |
| - Column & Beam Structural Grids (IS 456:2000 Grade M30/M40 Concrete) |
| - Two-Way Slab Systems & Staircase Reinforcement |
| - Detailed 3D Reinforcement Modeling (Fe500D Rebar, Stirrups, Ties) [2nd Floor]|
| - Automated Bar Bending Schedule (BBS) Generation |
+-----------------------------------------------------------------------------------+
|
v
| 5. VISUALIZATION & DOCUMENTATION OUTPUT LAYER (Enscape / Twinmotion / Revit Sheets)|
| - High-Resolution Perspective Renders (Exterior Facade, Courtyard, Retail) |
| - 30-Second 1080p Walkthrough Video Animation (Keyframed Architectural Path) |
| - 2D Structural Framing Sheets, Architectural Floor Plans & Sections (PDF/DWG) |
| - 5-7 Slide Presentation Deck |
+-----------------------------------------------------------------------------------+
| Layer | Selected Technology | Why Chosen | Alternative Considered | Why Alternative Rejected |
|---|---|---|---|---|
| Core BIM Modeling | Autodesk Revit 2024 / 2025 | Mandated explicit primary software [PS]; industry-standard parametric BIM authoring tool. | Graphisoft ArchiCAD | Forbidden by PS requirements [PS]. |
| Site & Microclimate | Autodesk Forma Site Design | Fast cloud-based sun, wind CFD, and microclimate analysis directly linked to Revit [PS]. | ANSYS Fluent / IES VE | Overly complex setup; lacks direct Revit massing integration plugin [RESEARCHED]. |
| BIM Automation | Dynamo for Revit | Visual programming engine built into Revit for automated rebar layout and facade louver variation [KNOWN]. | Grasshopper for Rhino | Requires external Rhino link and translation steps [KNOWN]. |
| Real-time Rendering & Walkthrough | Enscape for Revit / Twinmotion | Direct live-link plugin to Revit; enables rapid, high-quality 30-sec animation rendering in minutes [RESEARCHED]. | Native Revit Cloud Render / Blender | Native Revit walkthrough export is slow; Blender export loses BIM material parameters [KNOWN]. |
| Collaboration & Storage | Autodesk Construction Cloud (ACC) / Local LAN | Native Revit central file worksharing allowing 4–6 students to work concurrently [RESEARCHED]. | Google Drive sync | Sync conflicts destroy Revit .rvt central file lock databases [KNOWN]. |
| Presentation Deck | Microsoft PowerPoint / Canva | Universal format required for 5–7 slide presentation deliverable [PS]. | Adobe InDesign | Harder to edit dynamically during live presentation [KNOWN]. |
The problem statement explicitly dictates: "AI Generated content is NOT ALLOWED" [PS].
+-----------------------------------------------------------------------------------+
| LOCAL WORKSHARING & SYNCHRONIZATION |
+-----------------------------------------------------------------------------------+
| Student Workstation 1 (Architectural Core) --> Local Model (.rvt) --+ |
| Student Workstation 2 (Facade & Courtyard) --> Local Model (.rvt) --+ |
| Student Workstation 3 (Basement & Parking) --> Local Model (.rvt) --+ |
| Student Workstation 4 (Structural Rebar) --> Local Model (.rvt) --+ |
| | |
| (Sync to Central File) v |
| +-----------------------------------------------+ |
| | CENTRAL REVIT MODEL (LAN Server / Local Drive) | |
| | - Active Worksets: Arch, Struct, Site, MEP | |
| | - Automated Backup Every 30 Minutes (.3000) | |
| +-----------------------------------------------+ |
+-----------------------------------------------------------------------------------+
SIH26116_SharedParams.txt): Custom parameters created for EV_Charger_KW_Rating, Facade_Louver_Angle, Rebar_Bar_Mark, Concrete_Grade, and Occupant_Capacity [INFERENCE].Workset_01_Grids_Levels: Locked benchmark datum planes.Workset_02_Architecture_Podium: Commercial G+1 retail, entrance atrium, glazed shopfronts.Workset_03_Architecture_Residential: Floors 2–9 unit walls, doors, windows, balconies.Workset_04_Structure: RCC columns, beams, slabs, foundations, and 3D rebar elements.Workset_05_Site_Basement: Site topography, courtyard landscaping, basement ramp, parking stalls, EV chargers..rvt cached files on standalone laptops without active internet connection. Synchronization occurs when connected to a shared local Wi-Fi router or LAN switch [KNOWN]..rvt files, custom .rfa family files, .dyn Dynamo scripts, and presentation materials remain the original intellectual property of the student team, created exclusively for SIH 2026 [PS]..3ds, .obj, .fbx, .skp) from external model repositories. Revit Element Created Timestamps and Journal Logs verify ground-up authoring [INFERENCE].+-----------------------------------------------------------------------------------+
| HACKATHON MVP VS OUT OF SCOPE |
+-----------------------------------------------------------------------------------+
| IN SCOPE (MUST & SHOULD BUILD) | OUT OF SCOPE / DESCRIBED ONLY |
| ---------------------------------- | ----------------------------- |
| - Full B+G+9 Architectural Revit BIM Model | - Physical construction working dwgs |
| - 1 Level Basement (Parking + EV Grid) | - Fabrication-level MEP piping/HVAC |
| - Commercial G+1 Podium & Courtyard | - Live IoT smart building sensors |
| - Residential 2-9 Floors Unit Layouts | - Cost tendering & contractor BOQ |
| - Parametric Sun-Shading Facade System | - Physical structural lab load test |
| - 3D Rebar Detailing for 2nd Floor (IS 456) | - Full 10-story 3D rebar (Too heavy) |
| - 2D Structural Framing Sheets & BBS | - AI-generated synthetic renders |
| - Autodesk Forma Sun/Wind Analysis | (Strictly Forbidden [PS]) |
| - 5-7 Slide PPT & 30-Sec Walkthrough Video | |
+-----------------------------------------------------------------------------------+
MUST BUILD:
mm units [PS].SHOULD BUILD:
+-----------------------------------------------------------------------------------+
| 30-MINUTE LIVE JURY DEMONSTRATION WORKFLOW |
+-----------------------------------------------------------------------------------+
| Min 00-05: PowerPoint Presentation (5-7 Slides) |
| - Problem context, courtyard microclimate concept, zoning compliance |
+-----------------------------------------------------------------------------------+
| Min 05-12: Live Autodesk Revit 3D BIM Model Navigation |
| - Orbit live model, cut 3D section boxes through B+G+9 levels |
| - Inspect Basement EV chargers, Ground retail, 2nd Floor residential |
+-----------------------------------------------------------------------------------+
| Min 12-18: Live Structural Rebar Inspection (2nd Floor Focus) |
| - Zoom into beam-column junction node, display 3D rebar stirrups/hooks |
| - Show automated Bar Bending Schedule (BBS) updating in real-time |
+-----------------------------------------------------------------------------------+
| Min 18-23: Autodesk Forma Microclimate Insights |
| - Present cloud Sun Hours & Wind CFD analysis results |
| - Prove facade louver efficiency in reducing solar radiation |
+-----------------------------------------------------------------------------------+
| Min 23-26: 30-Second Walkthrough Video Screening |
| - Play 1080p rendered MP4 walkthrough showcasing building journey |
+-----------------------------------------------------------------------------------+
| Min 26-30: Jury Q&A & Code Compliance Verification |
| - Address IS 456, IS 1893 seismic, and NBC 2016 safety queries |
+-----------------------------------------------------------------------------------+
+-----------------------------------------------------------------------------------+
| IMPLEMENTATION ROADMAP (MARCH - SEPT 2026) |
+-----------------------------------------------------------------------------------+
| PHASE 1: PRE-DESIGN & SITE FEASIBILITY (Weeks 1-3 | Deadline: Mid-April 2026) |
| - Define site boundary (40x35m), plot setbacks, FAR calculations |
| - Load EPW climate data into Autodesk Forma; execute sun/wind massing studies |
| - SPOC submits Mandatory Autodesk SIH Form |
+-----------------------------------------------------------------------------------+
| PHASE 2: ARCHITECTURAL SCHEMATIC BIM MODELING (Weeks 4-10 | Deadline: June 2026) |
| - Author Revit Central File: Grid system, levels (-1 to 9) |
| - Model Basement EV parking layout, Ground+1st commercial retail podium |
| - Develop residential 2BHK/3BHK floor layouts (Floors 2-9) & Central Courtyard |
| - Author custom climate-responsive parametric facade louvers |
+-----------------------------------------------------------------------------------+
| PHASE 3: STRUCTURAL ENGINEERING & REBAR DETAILING (Weeks 11-18 | Deadline: Aug 2026)|
| - Model RCC structural framing (columns, beams, slabs, staircases) |
| - Model complete 3D rebar reinforcement for 2nd Floor (IS 456 / IS 13920) |
| - Generate 2D structural framing sheets, section callouts, and BBS schedules |
+-----------------------------------------------------------------------------------+
| PHASE 4: VISUALIZATION, WALKTHROUGH & SUBMISSION (Weeks 19-24 | Deadline: 30 Sep 2026)|
| - Set up camera paths in Revit / Twinmotion; render 30-sec walkthrough MP4 video |
| - Compile 5-7 slide PowerPoint presentation deck |
| - Audit model file against anti-AI and anti-plagiarism guidelines; Final Submit |
+-----------------------------------------------------------------------------------+
| Validation Category | Testing Procedure | Target Acceptance Metric | Validation Tool / Standard |
|---|---|---|---|
| BIM Interference / Clash Detection | Run Revit Interference Check between structural columns/beams and architectural doors/stairs/parking bays. | Zero hard clashes between columns and vehicle drive aisles / unit doors. | Revit Internal Interference Check Tool [KNOWN]. |
| Building Code & Area Efficiency | Verify Gross Built-up Area, Commercial GLA, Residential Efficiency, and Setbacks. | Residential efficiency $\ge 75%$; FAR within municipal limits (2.5–3.0). | Revit Schedule & Area Plan Analysis [KNOWN]. |
| Fire Evacuation Egress | Measure travel distance from furthest unit corner to fire escape staircase enclosure. | Maximum travel distance $< 30.0\text{ meters}$; Stair width $\ge 1.5\text{m}$. | NBC 2016 Part 4 Egress Compliance [RESEARCHED]. |
| Structural Rebar Compliance | Check minimum/maximum rebar percentages ($p_{\min} = 0.8%$, $p_{\max} = 4%$ for columns) and stirrup hook angles. | 135-degree seismic hooks; stirrup spacing $\le d/2$ at column ends. | IS 456:2000 & IS 13920:2016 [RESEARCHED]. |
| Daylight & Microclimate Validation | Evaluate daylight factor and sun hours on residential living room windows in Autodesk Forma. | Minimum 2 hours direct winter sunlight on $80%$ of residential units. | NBC 2016 Part 11 / Autodesk Forma Solar Analysis [RESEARCHED]. |
| Basement Parking Ergonomics | Test turning radius ($6.0\text{m}$ inner radius) and ramp slope gradient. | Ramp slope $\le 1:8$ ($12.5%$); clear vertical height $\ge 2.4\text{m}$. | NBC 2016 Part 3 Development Control Rules [RESEARCHED]. |
| Visual Render & Video Output | Inspect walkthrough playback frame-rate and image resolution. | Smooth 30fps playback at 1080p resolution; duration exactly 30 seconds. | Media Player / Video Inspector [PS]. |
| Risk Event | Likelihood | Impact | Severity | Mitigation Strategy |
|---|---|---|---|---|
| Revit File Slowdown / Crash from Heavy 3D Rebar | High | High | Critical | Model 3D rebar strictly for a single representative floor (2nd Floor) as permitted by PS [PS]; keep remaining floors as un-reinforced structural framing [INFERENCE]. |
| Disqualification via AI / Pre-built Model Flag | Low | High | Critical | Build 100% native Revit elements from scratch; do not import external .skp / .3ds models or use generative AI images [PS]. |
| Incomplete Faculty SPOC Form Submission | Medium | High | High | Ensure team lead coordinates with College SIH SPOC to complete Autodesk's mandatory Google Form prior to submission [PS]. |
| Spatial Clash Between Basement Columns & Parking | Medium | Medium | Medium | Adopt a standardized $7.5\text{m} \times 7.5\text{m}$ structural grid that cleanly accommodates 3 standard car parking stalls ($2.5\text{m} \times 5.0\text{m}$) per bay [INFERENCE]. |
| Walkthrough Rendering Time Exceeds Timeline | High | Medium | High | Utilize real-time GPU viewport renderers (Enscape / Twinmotion linked to Revit) instead of slow CPU raytracers [RESEARCHED]. |
| Unfavorable Autodesk Forma Wind CFD Results | Low | Medium | Low | Adjust courtyard entrance opening dimensions and add terrace landscape buffers to diffuse high-velocity winds [INFERENCE]. |
[ASSUMPTION 1] Plot Size & Shape: Assumed as a rectangular urban corner plot measuring $40.0\text{m} \times 35.0\text{m}$ ($1,400\text{ sq.m}$) with roads on North and East sides.[ASSUMPTION 2] Structural Column Grid: Established at $7.5\text{m} \times 7.5\text{m}$ intervals to optimize basement parking (3 stalls per bay) and residential unit room spans.[ASSUMPTION 3] Concrete & Steel Grades: Concrete M30 grade for slabs/beams, M40 for lower basement/podium columns; High-Yield Strength Deformed rebar Fe500D per IS 1786.[ASSUMPTION 4] Target Climate Zone: Warm-Humid / Hot-Dry urban Indian environment (e.g., Bengaluru / New Delhi) for EnergyPlus EPW climate analysis in Autodesk Forma.[NEEDS VALIDATION 1] Local Municipal Floor Area Ratio (FAR) Limit: Must be verified against specific city master plan bye-laws (assumed FAR 2.5–3.0).[NEEDS VALIDATION 2] Mandatory Faculty SPOC Form Link: Team lead must verify with college SPOC that Autodesk's mandatory SIH Google Form has been filled and submitted.[NEEDS VALIDATION 3] EV Charger Electrical Substation Footprint: Specific transformer room area requirements with local electricity supply authority.NBCS 2026 (SP 7:2026) / National Building Code of India (NBC 2016)
https://sitesetu.app/blog/nbcs-2026-national-building-construction-standards-india-guide [1.1]Autodesk Forma Environmental Impact Analysis Documentation
https://www.autodesk.com/products/forma-site-design/environmental-impact-analysis [2.1]IS 456:2000 & IS 13920:2016 Structural Concrete & Ductile Detailing Codes
https://www.imarcengineering.com/blog/how-to-design-civil-structural-and-mep-systems-for-manufacturing-plants-in-india [1.8]Smart India Hackathon 2026 Official Master Problem Statement Catalogue (SIH26116)
https://www.blinknbuild.in/Assets/SIH_2026_All_226_Problem_Statements_Master_Catalogue.pdf [3.3]What we think about this platform, and how it can help people solve SIH problems.
" 30M+ Google Gemini tokens went into researching, analyzing, and understanding all 233 SIH problem statements to make them easier to explore and solve. "
" The platform makes SIH problem statements much easier to understand. Having everything from the problem details to the procedure in one place. "
" Oh, you got ads? Well, we need to make money too! But, you can use our platform to help you win SIH and take home the prize money. "
Get in touch if you need help bringing your ideas to life, or simply have an interesting idea you'd like to talk through. I'm always open to a conversation and exploring new possibilities together.